New counter tops with custom 4" high back splashes so that we could install outlets along the length of the counter. 4 new faucets for the hand washing sinks and new pulls and knobs on the cabinets. Sure a lot of cabinet drawers in a Dentist's office!
Window trim and sills updated and removed the blinds so just waiting for tinted window film to be installed.
Window trim and sills updated and removed the blinds so just waiting for tinted window film to be installed.
New look of C2 Ice Fog satin paint on the walls and C2 Cotton semi-gloss paint on the baseboards, door and window trim.
Unfortunately we found illegal wiring when the old counter was removed. Outlets were wired by installing a plug in one outlet and hard wiring it into the other outlets and lamp wire was used. WRONG!!
So we pulled out the illegal wiring. Installed the proper 14/2 NMD wire with the correct connections INSIDE the outlet boxes.
Stayed tuned for Projects 2 and 3 later on in the year when we complete the other examination rooms and Reception area
Dave - 360renos
3 comments:
I have been reading the articles on this site for sometime. This is my first comment. Your blog has been very useful for me and it provides very good content.
I have been reading the articles on this site for sometime. This is my first comment. Your blog has been very useful for me and it provides very good content,Thanks for this blog.
Toronto Basement Renovations
Thanks for enjoying the posts we provide TBR
Post a Comment